STARTING QUESTION
What could the current operation and facility become through changes to process, labor, flow, storage, equipment, infrastructure, and physical design?
KAG validates how the operation and existing footprint perform, then develops future-state scenarios involving process, labor, layout, storage, equipment, infrastructure, and physical change.
What could the current operation and facility become through changes to process, labor, flow, storage, equipment, infrastructure, and physical design?
Validates and quantifies the current state, develops future-state operating scenarios, and defines the labor, equipment, facility, and capital requirements of the current-site alternative.
Develops the optimize-or-repurpose alternative so it can be evaluated with real-estate, capital, portfolio, and execution realities against the operating requirement.
Develop the current-site operating solution.
Best when the current site must be fully developed as a viable alternative before the business commits to improving, expanding, relocating, or repurposing.
Develop the current-site option without losing sight of the other paths.
Best when facility performance is tied to a larger capital, growth, real estate, or network decision.
How people, product, information, equipment, and vehicles move through the operation.
Where the footprint is overburdened, underused, fragmented, or poorly matched to the work.
What the site can support today and where practical additional capacity may exist.
How inventory, materials, work-in-process, and staging areas support or constrain performance.
Whether building systems, access, equipment, utilities, and support areas match operational needs.
How layout and site conditions affect safety, service, visibility, and day-to-day execution.
Quantify flow, throughput, usable capacity, storage, labor, and facility performance.
Design how work, labor, inventory, equipment, and information should move.
Define zones, staging, racking, circulation, and space-use requirements.
Establish forklift, racking, concrete, utility, equipment, and facility changes.
Quantify benefits, costs, tradeoffs, and practical implementation constraints.
Create an optimize-or-repurpose scenario ready to compare with real-estate, capital, portfolio, and execution alternatives.
Quantify what the existing footprint can realistically support before defaulting to expansion.
Rework flow, labor, storage, and support infrastructure into a coordinated operating state.
Translate the optimized scenario into sequenced requirements, cost implications, and execution priorities.
Develop the evidence, scope, and investment case required for a real comparison.